Newmont

Newmont Services Overview

At Newmont, we offer a range of specialized services at three different sites in Australia and one in Papua New Guinea:

1. Post Reline Re-Torque Elimination

  • This service increases site production by approximately 10 hours per reline.

2. Mill Flange Bolt Tensioning & Bolt Elongation Measurement During Construction

  • This is a core service for us, saving our clients days or even weeks during the construction phase.

3. Critical Mill Flange Bolt Tension Measurement and Adjustment During Shutdowns

  • This service maintains mill health for the life of the mine. When testing isn't utilized, failures in this area have cost sites weeks of lost production.

4. Redesign of Critical Bolting to Increase Life Span

  • With over 30 years bolting experience having witnessed many problems we can often provide designed solutions to existing issues.

5. Primary Crusher Hold Down Bolt Hydraulic Tensioning and Ultrasonic Bolt Tension Measurement

  • Additionally, carrying out ultrasonic measurements when initially tensioning these bolts allows us to store the "when built" results. At any time in the future, we can quickly re-monitor them to see if any in-service relaxation occurs. This enables our clients to either sleep easy or make considered plans to adjust them.

6. Elimination of Liner Bolt Failures

  • When a site experienced issues, we carried out ultrasonic bolt stress measurements that showed both: a) What the current process achieves. b) How much relaxation occurred during the reline and after the mill had run for 1 or 2 days.

  • This vital information allowed the site to make informed decisions that eliminated these failures.

 

Case Study

Working with Boltstress for our primary and secondary mill maintenance has been a game-changer for our operations. From the moment we engaged their services, the efficiency and professionalism were evident.

For our primary mill, the entire process – from establishing permits to setting up tooling and signing off on the Job Hazard Analysis (JHA) – was completed seamlessly within just 3 hours. What impressed us the most was the swift turnaround time for re-monitoring and adjusting bolts in each position, taking our crew only 60 to 90 minutes per position. With no need for scaffolding and a meticulous approach, we achieved the desired results effectively.

Similarly, for our secondary mill, the efficiency and precision exhibited by Boltstress were exemplary. The re-monitoring and adjustment of bolts in each position took a similar timeframe, ensuring thoroughness without sacrificing productivity. The fact that no scaffold was required further streamlined the process, making it hassle-free and efficient.

Overall, we couldn't be more pleased with the results delivered by Boltstress. Their expertise and dedication have significantly contributed to the smooth operation of our mills, and we look forward to continuing our partnership for years to come.

Derek Phillips-Jones, Shutdown Planner, Tanami Operations